Keywords
production flow
waiting time
cutting operation
countermeasures
action plan
waiting time
cutting operation
countermeasures
action plan
How to Cite
BĂLTEANU, Șef lucr.ing., dr.ec. A., & BÂLDEA, Șef lucr.dr.ing. M. (2020). SOLUTIONS FOR REDUCING THE WAITING TIME IN A PRODUCTION FLOW. Review of Management and Economic Engineering, 19(2), 279. https://doi.org/10.71235/rmee.166
Abstract
The present paper presents a study carried out in a production company. One of the problems of production is due to the existence of a long waiting time between the various operations. In this respect, the cause of the problem was identified, and subsequently solutions were proposed for its solution. Finally, due to the implementation of identified countermeasures, the waiting time was significantly reduced.

This work is licensed under a Creative Commons Attribution 4.0 International License.
Similar Articles
- Anamaria SIM, Oana Bianca BERCEA, Geanina Maria DAVID, Elena Simina LAKATOS, EVALUATING THE EFFICIENCY AND BENEFICIARY SATISFACTION OF THE SOCIAL ENTERPRISE CERTIFICATION PROCESS IN CLUJ , Review of Management and Economic Engineering: Vol. 23 No. 1 (2024)
- Neculai BAGIU, Silvia AVASILCĂI, Bogdan RUSU, TRADITIONAL VS. AGILE: THE CHALLENGE MINDSET SHIFT IN PROJECT MANAGEMENT , Review of Management and Economic Engineering: Vol. 21 No. 4 (2022)
- Petrică TERTEREANU, Alexandra-Ioana GÎNGU, Aurel Mihail ȚÎȚU, COUNTERFEITING AND INFRINGEMENTS UPON INTELLECTUAL PROPERTY RIGHTS , Review of Management and Economic Engineering: Vol. 20 No. 2 (2021)
- Victor CONON, Augustin SEMENESCU, INTERACTIONS BETWEEN THE PARTICIPANTS OF A BUSINESS MODEL IN THE RETAIL MARKET OF OPTICAL MEDICAL DEVICES IN ROMANIA , Review of Management and Economic Engineering: Vol. 20 No. 3 (2021)
- Ion STEGĂROIU, Andrei-Marius MATICIUC, THE EMERGENCE IN THE LEADERSHIP: THE MANIFESTATION OF DYSFUNCTIONALITIES IN ORGANIZATIONS , Review of Management and Economic Engineering: Vol. 22 No. 4 (2023)
- Maria-Diana EGRI, Dumitrița-Ioana APĂFĂIAN, Liviu MARIAN, THE INTERVIEW RESEARCH METHOD TO STUDY THE SORTING PROCESS IN THE PLANTS OF A GLOBAL AUTOMOTIVE COMPANY , Review of Management and Economic Engineering: Vol. 22 No. 3 (2023)
- Larisa IVAȘCU, THE IMPORTANCE OF URBAN FARMING IN THE CONTEXT OF GLOBAL SUSTAINABLE DEVELOPMENT , Review of Management and Economic Engineering: Vol. 21 No. 1 (2022)
- Gheorghe NEAMȚU, Aurel Mihail ȚÎȚU, Petrică TERTEREANU, SUSTAINABLE DEVELOPMENT OF ROAD TRANSPORT IN ROMANIA, IN THE CONTEXT OF ACCESSION TO THE SCHENGEN AREA , Review of Management and Economic Engineering: Vol. 22 No. 3 (2023)
- Aurel Mihail ȚÎȚU, Nicoleta-Madalina NIȚĂ, THE COMPETENCE LEVEL OF PROJECT MANAGERS, AN IMPORTANT INDICATOR IN THE SUSTAINABLE DEVELOPMENT OF ORGANIZATIONS , Review of Management and Economic Engineering: Vol. 22 No. 2 (2023)
- Geanina-Maria DAVID, Roxana-Maria DRUȚĂ, Ligia-Maria NAN, CIRCULARITY PRACTICES RELATED TO THE RECYCLING OF WOOD WASTE FROM INDUSTRIAL PROCESSES: A SYSTEMATIC REVIEW OF THE LITERATURE , Review of Management and Economic Engineering: Vol. 22 No. 2 (2023)
You may also start an advanced similarity search for this article.
Most read articles by the same author(s)
- Șef lucr.dr.ing. Monica BÂLDEA, Șef lucr.ing.,dr.ec. Ancuța BĂLTEANU , APPLICATION OF THE METHOD AMDEC IN A PRODUCTION FLOW , Review of Management and Economic Engineering: Vol. 19 No. 1 (2020)